View Single Post
Old 04-14-07, 01:03 PM
  #1  
BSLeVan
Senior Member
 
Join Date: Feb 2007
Location: S.E. Pennsylvania, USA
Posts: 1,737
Mentioned: 0 Post(s)
Tagged: 0 Thread(s)
Quoted: 2 Post(s)
Likes: 0
Liked 0 Times in 0 Posts
Build Project Completed...

I've been working on a build that I finally completed last night and test rode today. I got a 1990s Specialized steel frame, and built it up with Ultegra 9 speed, FSA carbon cranks, Ultergra Hub on Mavic Open Pros, Cinelli stem, and Specialize Toupe seat. After two hours on it today, I can say that this is $300 and 30+ hours that were a very, very good investment. I don't think the carbon fiber is going to get much riding time for a few weeks.
Attached Images
File Type: jpg
P1000137.JPG (94.0 KB, 40 views)

Last edited by BSLeVan; 04-14-07 at 01:12 PM.
BSLeVan is offline