Thread: Ask gonesh9
View Single Post
Old 05-06-04 | 04:56 PM
  #66  
Jeepbikerun's Avatar
Jeepbikerun
Senior Member
20 Anniversary
 
Joined: May 2002
Posts: 160
Likes: 0
From: spokane, wa
Originally Posted by gonesh9
Dear JBR,

I understand your situation with empathy. I was recently involved in a study which directly proved my theory concerning hydrocarbon fuels in respect to preparation from wastes or biomass:

http://www.osti.gov/energycitations/...sti_id=6304819

A study was conducted to determine the role of concentration of the test chemical, or a second organic compound, and of mutation in the acclimation period before the mineralization of organic compounds in sewage.^The acclimation period for the mineralization in sewage of 2 micrograms of 4-nitrophenol (PNP) per liter increased from 6 to 12 days in the presence of 10 mg of 2,4-dinitrophenol per liter.^The extension of the acclimation period was equivalent to the time required for mineralization of 2,4-dinitrophenol.^In contrast, the time for acclimation for the degradation of 2 micrograms of PNP per liter was reduced when 10 or 100 mg of phenol per liter was added.^Lower phenol levels increased the acclimation period to 8 days.^The length of the acclimation period for PNP mineralization decreased as the initial concentration of PNP increased from 2 micrograms to 100 mg/liter.^The acclimation period for phenol mineralization was lengthened as the phenol concentration increased from 100 to 1,400 mg/liter.^The length of the acclimation period for PNP and phenol biodegradation was reproducible, but it varied among replicates for the biodegradation of other nitro-substituted compounds added to sewage or lake water, suggesting that a mutation was responsible for acclimation to these other compounds.^The acclimation period may thus reflect the time required for the destruction of toxins, and it also may be affected by the concentration of the test compound or the presence of other substrates.
Thank you for your great wisdom! It is settled then, I will ride naked beginning 08/03.

JBR
Jeepbikerun is offline