Thread
:
NorCal BF Labor Day Ride
View Single Post
08-29-07, 09:55 AM
#
113
jonathanb715
Senior Member
Join Date: Jan 2007
Location: NorCal
Posts: 1,695
Bikes:
Kestrel Talon
Mentioned: 0 Post(s)
Tagged: 0 Thread(s)
Quoted: 0 Post(s)
Likes: 0
Liked 0 Times in 0 Posts
Quote:
Originally Posted by
msincredible
There was a question in another topic about shorter routes for this ride.
I just quickly mapped out a couple of possible options for shorter loops.
The main route is about 56 miles, 5600'.
http://www.bikely.com/maps/bike-path...Kings-Mtn-Loop
If you take Page Mill down off of Skyline to Altamont and that back to Foothill, it looks like 33 miles, 4800'.
http://www.bikely.com/maps/bike-path...Page-Mill-loop
If you cut off of 9 at Redwood Gulch, you can take that to Stevens Canyon and take that back to the start.
18 miles, 3000'.
http://www.bikely.com/maps/bike-path...Stevens-Canyon
You're supposed to go UP Redwood Gulch, not down
Seriously, this is a very steep and technical descent.
JB
Reply
jonathanb715
View Public Profile
Find More Posts by jonathanb715