View Single Post
Old 10-30-07 | 07:46 PM
  #18  
Allister's Avatar
Allister
Devilmaycare Cycling Fool
20 Anniversary
 
Joined: Aug 2001
Posts: 3,819
Likes: 0
Originally Posted by Blue Order
The bridge was begun in 1934, and completed in 1936, so the side path was undoubtedly dedicated to bicycle-specific use as an afterthought, despite the last-minute intensive lobbying efforts of the suicide lobby.
Yeah, but even as a footpath only, pinch points like that would be unacceptable. I was asking if the paths themselves were added later after the bridge was complete. If they were all designed and built at the same time, then shame on the designers. SHAME! I say.
Allister is offline  
Reply