The DCR is doing work on the bike path (Boston side) along the Charles.
the other night I decided to ride past the signs and get a look at what they're doing- looks like a repaving of a 1/4 mile section between Western Ave and the BU railbridge.
rode in in the morning with my wife. met her up later for the late night ride home from Cambridge. It's pretty chilly.
...and oh yeah, slipped on a slice of pumpkin that was squashed in the middle of the road and almost went down- it was as if I had hit sheer ice.