Old 01-26-08 | 11:53 PM
  #18  
Shprung's Avatar
Shprung
Senior Member
 
Joined: Mar 2007
Posts: 402
Likes: 0
From: Encino, CA

Bikes: Scott Addict LTD ; A Fixed gear

Date of Ride: Jan, 26
Type of Ride: SFVBC Saturday extended renovate
Actual Mileage: 97.2
Total Time: 7:30
Avg. Speed: 16.0
Altitude Climbed: ~5000
Weather conditions: 44 - 58, dry day after after 5 days of non-stop rain; road are wet and mudi in parts.
Synopsis of Ride: From home (encino) to CSun; SFVBC had no real route. We started the Wed. ride to west lake. Then, some left some added to create a new group. To hidden valley, Simi, back via Box Canyon, Valley circle, and back to Encino.
Shprung is offline  
Reply