Originally Posted by
LT Intolerant
I believe the formula for determining what TSS is required to hit a desired ramp rate is...
((Current CTL) + (6*Desired Ramp Rate)*7)= Needed TSS to Achieve Ramp Rate
Shouldn't it be
((Current CTL) + (6*Desired Ramp Rate)
)*7= Ramp Rate ??