View Single Post
Old 07-20-13, 09:57 PM
  #72  
Bikedued
Senior Member
 
Bikedued's Avatar
 
Join Date: Jul 2004
Posts: 10,963
Mentioned: 10 Post(s)
Tagged: 0 Thread(s)
Quoted: 205 Post(s)
Liked 107 Times in 60 Posts
Thanks. Eight days huh? If I had waited for Campy brakes it would have been months possibly. I couldn't wait that long. I took it on a very short ride, touching only the hoods as not to mar the shellac. It was nice! tomorrow is the shakedown, about 12-15 miles.,,,,BD
__________________
So many bikes, so little dime.
Bikedued is offline