View Single Post
Old 10-17-17 | 01:09 AM
  #1156  
acidfast7
Banned
 
Joined: Jul 2010
Posts: 8,543
Likes: 41
From: England / CPH

Bikes: 2010 Cube Acid / 2013 Mango FGSS

All of the floor boards in the front half came up and the debris removed, the soil was taken away from the wall and the wiring and plumbing was inspected.

A little bit of tweaking is required. For example, those joists should be properly sistered with lag bolts.

However, the previous work was done to a very high standard, which surprised me and left me feeling warm inside, even if the house is getting cold now.
Attached Images
File Type: jpg
IMG-20171015-WA0000.jpg (560.5 KB, 237 views)
acidfast7 is offline  
Reply