All of the floor boards in the front half came up and the debris removed, the soil was taken away from the wall and the wiring and plumbing was inspected.
A little bit of tweaking is required. For example, those joists should be properly sistered with lag bolts.
However, the previous work was done to a very high standard, which surprised me and left me feeling warm inside, even if the house is getting cold now.