Recently built out the basement. Framing, electrical, drywall, paint, floor, trim. I left the ceiling raw joists and primed them with a sprayer along with the raw drywall. My recommendation, don't do it, pay a guy. The trim caused the need for an L4/L5 fusion. Again, don't do it, pay a guy.
1/3 of the basement is unfinished, has the furnace, water heater, storage, etc. 1/3 is a woodshop. The final 1/3 is the bike lounge. Bike part storage under the stairs.