Old 09-23-07 | 06:25 PM
  #390  
spingineer's Avatar
spingineer
Spinning like a gerbel
 
Joined: Jul 2005
Posts: 7,960
Likes: 4
From: Silicon Valley

Bikes: Seven

Originally Posted by SteveE
In NorCal, the same ride would start at 9am and be finished by 12 noon.
No Steve, the same ride that YOU would start at 9 am would be finished by noon. But we did stop for about 30 minutes at Goldstein's Bagel's, so if it weren't for that, we'd be finished by noon

I think AltoVelo would have finished the ride by 11 am.
__________________
I'm in it to finish it.

My Cycling Blog
spingineer is offline  
Reply