Rails to Trails
#1
Senior Member
Thread Starter
Join Date: Jul 2013
Location: Spokane, WA
Posts: 66
Bikes: Fuji road bike and Mountain bike. Giant road bike and Mtn bike, Motobecane Crossbike and Mtn bike, Cycle Pro road bike.
Mentioned: 0 Post(s)
Tagged: 0 Thread(s)
Quoted: 0 Post(s)
Likes: 0
Liked 0 Times
in
0 Posts
Rails to Trails
Anyone know how much financial aid Rails to Trails will give to finish a deserving Trail? We have a trail here in Eastern Washington that has a 2 1/2 mile middle section that isn't finished because the Railroad BNSF insists that a bridge be built over their active railway tracks that will cost 3 million to complete. A few riders traverse the 2 1/2 mile section and just stop and look both ways to cross the active tracks, but that is trespassing and a serious offense most likely.
Total length of the trail will be 15 miles with a junction to another trail that is 3 miles long.
?
Total length of the trail will be 15 miles with a junction to another trail that is 3 miles long.
?